Cheshill Cove School

12 August 2014
Category:
Projects
Comments:  1

Brief

To provide a 100KW biomass plantroom, incorporating full gas boiler back-up, to provide a low carbon heating solution and part of an excellent BREEAM rating for the project. The new 315 pupil school at Portland was originally used as a 2012 Olympic venue for the sailing events and the plantroom was installed prior to the games. It was then re-commissioned once the venue had been converted into a school.

 

Programme

7 weeks

 

Scope of services

To design, manufacture, deliver and commission an integrated biomass/gas boiler plantroom, incorporating a Schmid 100KW boiler, integrated wood pellet fuel store, pumps, buffer vessel, valves and pipework as well as 2 off 85KW wall hung gas boilers.

 

Solution

The 9m x 3.8m x 3.5m plantroom was fitted with fuel fill pipework for blown fuel deliveries and finished in micro-rib cladding panels. The internal pipework comprises 2 heat meters, one on the total output and one on the biomass to ensure RHI compliance. The buffer vessel is connected onto the biomass only so that the gas boilers will only operate as a secondary heat source.

 

Result

The delivery of a plug and play prefabricated plantroom enabled the unit to be delivered in time for the 2012 games and the biomass specification provides the carbon reduction commitment and helped towards the excellent BREEAM award.

 

One response on “Cheshill Cove School

  1. This opportunity came because of their faithfulness to the gospel irrespective of the persecution. Well, thanks to the intelligent men over
    at the Dev Team, a remedy is there. Eventually, I made the decision to move to
    android.

Leave a Reply

Your email address will not be published.